Ox4Eva
Well-known member
I was looking at the plans for the new plough lane ground it's £20 million for an initial 11k capacity stadium with option to increase to 20k if required.
Scunthorpe are looking at building a 12k capacity ground for £18 million. That includes a hotel, gym and other stuff.
When you think of what is rumoured to be the cost of taking ownership of our dump it really is worrying!
Scunthorpe are looking at building a 12k capacity ground for £18 million. That includes a hotel, gym and other stuff.
When you think of what is rumoured to be the cost of taking ownership of our dump it really is worrying!